Page 239 - Demo
P. 239
%u00ae Package Order No.:%u0009 BP2-60 (R or L) (3-bar only package)Upgrade Package No.:%u0009 BP2-60 (R or L) WHT (1-1/4%u201d dia., white powder coat, 3-bar only package)Package Includes: Factory installed, 1-1/2%u201d dia. stainless steel, 3-bar package with basic reinforcement for components (as shown).NOTES: Positioning of factory installed components allow for the installation of a shower enclosure.%u201cR or L%u201d designates RH or LH control wall.Package Order No.:%u0009 BP3-60 (3-bar only package)Upgrade Package No.:%u0009 BP3-60 WHT (1-1/4%u201d dia., white powder coat, 3-bar only package)Package Includes: Factory installed, 1-1/2%u201d dia. stainless steel, 3-bar package with basic reinforcement for components (as shown).NOTE: Positioning of factory installed components allow for the installation of a shower enclosure.ActivLifesolutionsActivLifesolutions4%u201doffside wall48-3/4%u201d30%u201d41-1/2%u201d 24%u201d BarSHT-4834 ABF / TL-LS(7/29/24 v1.0)24%u201d Bar 6%u201d41-1/2%u201d33%u201d (std)35%u201d (ABF)25-1/2%u201d7-1/4%u201dll*Preliminary Drawing2%u201dRight (Control) Wall Left (Seat) WallSHT-6034 ABF / BP1-60/R(RH Control Wall)(9/17/24 v1.0)Right (Control) WallTypicalControlArea24%u201dBar4%u201d13-1/2%u201d24%u201d Bar1-1/4%u201d Back Wall 1-1/4%u201dAccessoryShelf34%u201d17%u201d3-3/8%u201d Dia.DrainAccessory Shelf35-1/4%u201d3-1/2%u201d8%u201d17%u201dLeft Side Wall34%u201d 60%u201d4%u201doffside wall48-3/4%u201d30%u201d41-1/2%u201d 36%u201d BarSHT-4834 ABF / TL-LS(7/29/24 v1.0)24%u201d Bar 6%u201d41-1/2%u201d33%u201d (std)35%u201d (ABF)10-3/8%u201d 10-3/8%u201dll*Preliminary Drawing2%u201dRight (Control) Wall Left (Seat) WallSHT-6034 ABF / BP3-60(11/13/24 v1.0)Right Side WallTypicalControlArea41-1/2%u201d6%u201d 24%u201d Bar33%u201d (std)35%u201d (ABF)2%u201dTypicalControlArea1-1/4%u201d Back Wall 1-1/4%u201dAccessoryShelf34%u201d17%u201d3-3/8%u201d Dia.DrainAccessory Shelf35-1/4%u201d3-1/2%u201d8%u201d17%u201dLeft Side Wall34%u201d 60%u201d237